Local NHS Trust Hospital Fire Door Inspection

Local NHS Trust Hospital Fire Door Inspection

Project Date September, 2021

The project

Acuity were selected to conduct a full inspection of all the fire rated doorsets at a local hospital. Carrying out the inspection over a period of 5 weeks during the COVID 19 pandemic required a high level of planning, communication and cooperation with the Hospital Estate Management team and the Clinical Staff. Every area of the hospital was surveyed including Operating Theatres, Wards, Administration Blocks and Wards which meant strict programme adherence was essential.

Number of Doorsets Inspected – 965

Inspection Period on Site – 5 Weeks