Case Study - 06/07/2022
The project
Acuity conducted a Compartmentation Survey and Fire Door Inspection to multiple sites for a major Pharmaceutical Vaccine Manufacturer. This project required intense planning as there were many restrictions on working in areas due to the procedures being carried out. Operating under permits to work with very detailed Fire Risk Assessments and Method Statements in place, and site management working with the management on site to ensure that access to areas was all controlled and coordinated, we delivered a full survey within very tight controls.
Inspection Period on Site – 12 Weeks