Private Student Accommodation Provider Fire Door Inspections

Private Student Accommodation Provider Fire Door Inspections

Project Date April, 2021

The project

Acting on behalf of our client, Acuity provided Fire Door Inspections to a newly built High Rise Student Accommodation block. The building was handed over to the occupiers from the main contractor with inherent defects to the Fire Door Installation. Acuity worked with the building management to conduct a full survey of the Fire Doors, and carry out regular checks on the remedial works carried out by the contractor to ensure works were completed as required.

Number of Doorsets Inspected – 775

Inspection Period on Site – 4 Weeks